Click here to download the full project report in pdf format.
Location
Al-Amar Project is located at about 900m above sea level in a desert area where annual rainfall is generally less than 100 mm per year.
Location: Central Saudi Arabia, at the Eastern edge of the Arabian Shield.
Deposit: Gold, copper, zinc, vein type, open down dip.
Resources: North Vein Zone, 1.55 Mt at 12.31 g/t Au.
Measured and Indicated 6.16% Zn, 21.07g/t Ag, 0.92% Cu.
Other inferred resource: South Vein Zone (3.0 Mt at 5.1 g/t Au).
Production : 200,000 tons per year
To read more click here to download the project report in pdf format. |